采购合同范本英文(2)

时间:2021-08-31

  Article 7 Contracted Price and Values

  Price:Mn: 48% and above - USD0.00/%/DMTCFRCY Port, China

  40% - 47.9% - USD 0.00 /%/DMTCFRCY Port, China

  The Mn content will be average of the joint-inspection testing result at loading port.

  Article 8 Payment

  8.1 Payment shall be effected in full by an irrevocable Letter of Credit, which will be opened by 1stclass bank in Hong Kong or Singapore, 100% at sight upon presentation of shipping documents.

  A. Seller’s Banking Details:

  Bank Name :

  Bank Address :

  Account Name :

  S.W.I.F.T. CODE SWIFT :

  B. Buyer’s bank issues L/C to the Seller's bank via S.W.I.F.T. wire transfer.

  Buyer’s Banking Details:

  Bank Name : (will be advised)

  Bank Address :

  Account Name:

  S.W.I.F.T. Address SWIFT :

  Article 10 Inspection of Analysis & Weight

  The shipmentinspection and analysis shall be done byCCICappointed by the Seller and one independent surveyor (i.e.: SGS or Geo-Chem, etc) appointed by the buyeras agreed by both parties at site before loading to container. While final weightand qualitydetermination shall be done atloadingportby the above joint-survey.Moisture content shall be deducted from the total weight shipped.

  Article 11 Documents

  Seller shall present the following documents to the buyer:

  A. Signed Commercial Invoice for 100% of the total cargo value indicating, quantity, unit price and the total Amount of Value of the delivered commodity , 1 original and 3 copies.

  B. Certificates of quantity, quality and weight issued byCCICand one independent surveyor appointed by the buyer.

  C. Certificate of Origin issued by ABC Department Of Trade or concerned Government authorities, I original and 2 copies.

  D. Weight List, showing total weight , 1 original and 3 copies.  E. Bill of Lading, 3 original copies and 3 non-negotiable copies.

  Article 12 Force Majeure

  The Seller shall not be responsible for the delay of shipment or non-delivery of the goods due to Force Majeureunder UCP 600. The seller shall advise the buyer immediately of the occurrence mentioned above and within 3 days thereafter the seller shall send a notice by courier to the buyer of their acceptance of a certificate of the accident issued by the local chamber of commerce under whose jurisdiction the accident occurs as evidence thereof. Under such circumstances the seller , however, are still under obligation to take all necessary measures to hasten the delivery of the goods. In case the accident lasts for more than 60 days the buyer shall have the right to cancel the Contract.

  Article 13 Arbitration

  All disputes arising out of or in connection with this Contract shall be finally resolved by arbitration in accordance with the Rules of Arbitration of the International Chamber of Commerce (UCP-600/2007 or Uniform Customs and Practice for Documentary Credits) by one or more arbitrators appointed in accordance with the said rules. The arbitration shall be conducted in ABCbythe English language.

  Buyer Seller